Case Study: Concrete Repairs to ‘60s RC frame buildings
07/06/2013
The main teaching block and science block of the school were built in 1967. Both are reinforced concrete frame buildings that featured exposed reinforced concrete columns and windo...
moreMedway Crematorium update
22/04/2013
Phase 1 works at Medway Crematorium— east chapel extension, new cremator plant, extended car park— are nearly complete. Phase 2 ( west chapel extension ) is scheduled to complete i...
moreLaunch Lunch
02/02/2013
On Saturday 2nd February 2013, volunteers for the ‘Making Places, Chaning People’ project met for a special launch lunch at the Three Daws pub. It was an opportunity for volunteers...
moreKent Design Award 2012 for Best Public Building ( Education )
06/12/2012
Last night, at the Marlowe Theatre in Canterbury, along with 6 other projects ( out of 94 entrees ), Walderslade Primary School won a Kent Design Award
morePlace making: Makers and architects in collaboration
15/03/2012
Attended 3 day on-site residency Place making: makers and architects in collaboration, jointly organised by Kent Architecture Centre and the Crafts Council and hosted by the Univer...
moreBuildings we like # 1: No. 3 slip, Chatham Historic Dockyard
22/11/2011
If you google-earth Chatham Historic Dockyard or drive eastwards towards the Medway tunnel you will see 5 linked large shed structures along the banks of the Medway: these are the...
more